ERG Air Pollution Control LTD
ERG Air Pollution Control
INDUSTRIAL GAS CLEANING
& THERMAL SYSTEMS
UK office: +44 1403 290 000 Middle East office: +962 6515 9021 Email: info@ergapc.co.uk
UK office: +44 1403 290 000
Middle East office: +962 6515 9021
Email: info@ergapc.co.uk
Scrubber package settler

Integrated Effluent Treatment

The majority of ERG’s air pollution control packages generate a liquid effluent stream. In many cases this is handled on site by an ETP (effluent treatment plant) or is discharged to sewer under a waste discharge license, or if necessary is tankered away to trade effluent treatment. ERG is able to integrate the air pollution control plant with specific effluent treatment steps to minimise the quantity or composition of the effluent, saving you money on your effluent disposal.

Our integrated effluent treatment may be as simple as pH correction or solids separation in a settler, or may include complex pre-treatment and evaporation for a zero-effluent discharge. We can offer the following effluent treatment steps to complement our gas cleaning package:

  • pH correction
  • settling
  • flotation
  • flocculation
  • sand filtration
  • carbon filtration
  • hydrocyclone thickening
  • dewatering using vacuum or gravity belt thickening
  • low temperature, low pressure evaporation

Talk to ERG’s specialist process designers to investigate how you can save effluent disposal costs by integrating your APC package with a dedicated effluent treatment package.

Integrated Effluent Treatment

The majority of ERG’s air pollution control packages generate a liquid effluent stream. In many cases this is handled on site by an ETP (effluent treatment plant) or is discharged to sewer under a waste discharge license, or if necessary is tankered away to trade effluent treatment. ERG is able to integrate the air pollution control plant with specific effluent treatment steps to minimise the quantity or composition of the effluent, saving you money on your effluent disposal.

Our integrated effluent treatment may be as simple as pH correction or solids separation in a settler, or may include complex pre-treatment and evaporation for a zero-effluent discharge. We can offer the following effluent treatment steps to complement our gas cleaning package:

  • pH correction
  • settling
  • flotation
  • flocculation
  • sand filtration
  • carbon filtration
  • hydrocyclone thickening
  • dewatering using vacuum or gravity belt thickening
  • low temperature, low pressure evaporation

Talk to ERG’s specialist process designers to investigate how you can save effluent disposal costs by integrating your APC package with a dedicated effluent treatment package.

Scrubber package settler
UK office: +44 1403 290 000 Middle East office: +962 6515 9021 Email: info@ergapc.co.uk
UK office: +44 1403 290 000
Middle East office: +962 6515 9021
Email: info@ergapc.co.uk
ENQUIRE HERE

6 + 2 =