System Design Contracts
We have extensive design capabilities. In addition to straightforward design and build air pollution abatement projects, our clients also benefit from:
- 3D modelling of all packages – we model using Plant 3D and export as .dwg and Navisworks
- BIM integration
- Optioneering and FEED contracts
All design and build contracts include a complete set of design deliverables as standard. All ERG design is backed by our Professional Indemnity Insurance. CVs of ERG’s design team are available on request.
Optioneering and FEED (Front End Engineering Design) Contracts
On occasions, clients do not have a fully developed procurement specification for their new air pollution control system, or wish to explore technology or cost options.
Also there is frequently pressure to improve the environmental impact of existing manufacturing/production sites – new processes requiring additional treatment, new housing or commercial developments close to the site boundary, or older gas cleaning systems reaching the end of their service life.
- Summary report identifying the available options for reusing/upgrading air pollution control assets versus providing new system(s)
- Details of the technical and construction pros and cons of each option
- Indicative CapEx and OpEx costings for major options
- Preliminary engineering design for selected option – input to the formal project specification
Read about how this approach benefited several of ERG’s clients who have recently implemented large gas cleaning projects to improve their site’s environmental impact.
System Design Contracts
We have extensive design capabilities. In addition to straightforward design and build air pollution abatement projects, our clients also benefit from:
- 3D modelling of all packages – we model using Plant 3D and export as .dwg and Navisworks
- BIM integration
- Optioneering and FEED contracts
All design and build contracts include a complete set of design deliverables as standard. All ERG design is backed by our Professional Indemnity Insurance. CVs of ERG’s design team are available on request.
Optioneering and FEED (Front End Engineering Design) Contracts
On occasions, clients do not have a fully developed procurement specification for their new air pollution control system, or wish to explore technology or cost options.
Also there is frequently pressure to improve the environmental impact of existing manufacturing/production sites – new processes requiring additional treatment, new housing or commercial developments close to the site boundary, or older gas cleaning systems reaching the end of their service life.
- Summary report identifying the available options for reusing/upgrading air pollution control assets versus providing new system(s)
- Details of the technical and construction pros and cons of each option
- Indicative CapEx and OpEx costings for major options
- Preliminary engineering design for selected option – input to the formal project specification
Read about how this approach benefited several of ERG’s clients who have recently implemented large gas cleaning projects to improve their site’s environmental impact.