Carbon Filtration for Odour Control at Boat of Garten Sewage Treatment Works
Project Overview
ERG Air Pollution Control supplied a carbon filtration odour control plant for Ross-shire Engineering on behalf of Scottish Water. Delivered in 2019, the package served the upgraded packaged SAF plant at Boat of Garten Sewage Treatment Works, near the River Spey in the Scottish Highlands.
The equipment included a carbon filter, fans with acoustic enclosures, extraction ductwork, a discharge stack, instrumentation and a motor control centre (MCC) and control panel. The scope covered the air path from extraction at the treatment plant through to filtration and discharge, with provision for fan noise control and plant operation.
The Challenge – Integrating Odour Extraction with a Packaged Treatment Plant
At a sewage treatment works, effective odour control starts with collecting air at the source and conveying it to treatment. The extraction connections, ductwork and fans all influence how much air reaches the filter. The filter must then provide enough contact between the air and the media for the compounds being treated.
At Boat of Garten, the odour control plant formed part of an upgrade to a packaged sewage treatment works. The photographs show duct branches connected to the covered process equipment and routed alongside the plant’s walkways. For this type of installation, those connections need to fit around the existing layout while leaving operators access to both the process equipment and the odour control system.
The equipment specification also included acoustic enclosures for the fans. That made fan noise a design consideration alongside extraction and filtration.
ERG’s Solution – Carbon Filtration for Extracted Air
ERG supplied a carbon filter to treat extracted air from the upgraded plant. Carbon filtration works by adsorption. As air passes through the media, suitable gaseous compounds adhere to the carbon’s internal surfaces.
The choice of carbon depends on the compounds present and the conditions of the extracted air. Contaminant loading, moisture and temperature can all affect media capacity. Air distribution through the filter also matters. Even distribution helps make use of the bed, while the airflow and bed dimensions determine the time available for contact.
Carbon media have a finite treatment capacity. Planning for inspection and replacement therefore forms part of the equipment layout. Operators need access to the vessel and enough working space to handle the media during servicing.
Engineering and Integration – Fans, Acoustics and Controls
The fans provide the pressure needed to move extracted air through the ductwork, carbon filter and discharge stack. In a system like Boat of Garten, duct length, bends and filter resistance all contribute to the fan duty. Assessing the full air path helps match the fans to the extraction requirement.
The fans were supplied with acoustic enclosures. These are used to limit noise radiated by the fan equipment. Their layout needs to allow for ventilation and servicing alongside the acoustic function.
Instrumentation and an MCC/control panel were also included. These components provided the electrical control and monitoring equipment for the package. The stack completed the air path by providing a defined route for discharge after treatment.
Project Technical Specifications
| Parameter | Project details |
| Client | Ross-shire Engineering |
| End user | Scottish Water |
| Site | Boat of Garten Sewage Treatment Works, Scottish Highlands |
| Application | Odour control for an upgraded packaged SAF plant |
| Treatment technology | Carbon filtration |
| Extraction equipment | Fans and ductwork system |
| Acoustic provision | Fan acoustic enclosures |
| Discharge equipment | Stack |
| Electrical and monitoring scope | Instrumentation and MCC/control panel |
| Year delivered | 2019 |
Engineering Benefits
- Extraction and treatment in one package. The ductwork, fans, carbon filter and stack covered the air path from the process equipment to discharge.
- Fan noise considered in the equipment design. Acoustic enclosures formed part of the fan supply.
- Controls included with the treatment equipment. Instrumentation and an MCC/control panel supported operation of the odour control package.
ERG’s Expertise in Packaged Wastewater Odour Control
The Boat of Garten project illustrates ERG’s experience supplying carbon filtration and the associated air handling equipment for a packaged sewage treatment works upgrade. For similar projects, ERG can assess the extraction points, air characteristics, site layout and service access to select equipment suited to the plant.
Contact ERG Air Pollution Control to discuss carbon filtration or an odour control upgrade for a wastewater treatment facility.
