Client: SAFC Hitech
Site: South Korea
Equipment: 2 off 3 stage V-tex scrubbers
Gas flowrate: 15,000m3/hr
Year delivered: 2010
ERG delivered the SAFC Hitech project for SAFC Hitech at South Korea in 2010. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
