Client: APS for Autosmart
Site: Burntwood
Application: Fumes from LEV extracts from new; automotive cleaning products line; Gas flow rate 4,600 m3/h; 98% removal efficiency of sulphuric
Equipment: UPVC/GRP packed tower, scrubber, generally in, accordance with BS EN 13121:3, GRP fan, uPVC/GRP stack, PP mag drive recirculation pump and Control panel
Year delivered: 2024
ERG delivered the APS for Autosmart project for APS for Autosmart at Burntwood in 2024. The case study identifies the application as Fumes from LEV extracts from new; automotive cleaning products line; Gas flow rate 4,600 m3/h; 98% removal efficiency of sulphuric. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
