Client: Cargill plc
Site: Merseyside, UK
Application: Oil seed rape processing -; odour and particulate; removal from Dryer Cooler; process air discharge
Equipment: First and second stage spray, towers – Derakane 470 GRP, Discharge stack, Recirculation pumps, pipework, and instrumentation, Sub-cooler heat exchanger and embly at ERG’s workshop
Year delivered: 2019
ERG delivered the Cargill PLC – Merseyside – Spraytowers project for Cargill plc at Merseyside, UK in 2019. The case study identifies the application as Oil seed rape processing -; odour and particulate; removal from Dryer Cooler; process air discharge. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.