Client: Essar Oil
Site: Stanlow Refinery, UK
Application: BTEX stripping from waste; water – 156m3/hr water,; with BTEX removal 99.8%; to 0.4 mg/litre
Equipment: Packed tower stripping, column, 2.2m dia column, with 3.5m dia sump, PVDF/GRP construction, to BS EN 13121-3:2016, and Shell specs, Stripping air fan and duct and Integral access structure
Year delivered: 2019; PROJECT; DETAILS; 23m3 sump
ERG delivered the Essar Oil project for Essar Oil at Stanlow Refinery, UK in 2019; PROJECT; DETAILS; 23m3 sump. The case study identifies the application as BTEX stripping from waste; water – 156m3/hr water,; with BTEX removal 99.8%; to 0.4 mg/litre. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.