IFF 2 – Haverhill – Maintenance

Client: IFF International Flavors; Fragrances

Site: Haverhill

Equipment: Boiler flue gas cleaning and system

Gas flowrate: Up to 12,000m3/hr

Project value: £450k

Year delivered: 2012

ERG delivered the IFF 2 – Haverhill – Maintenance project for IFF International Flavors; Fragrances at Haverhill in 2012. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.

Case Studies

Industrial gas cleaning/Thermal systems

System Maintenance

Odour control

Plastic-GRP Fabrication