Client: IFF International Flavors; Fragrances
Site: Haverhill
Equipment: Boiler flue gas cleaning and system
Gas flowrate: Up to 12,000m3/hr
Project value: £450k
Year delivered: 2012
ERG delivered the IFF 2 – Haverhill – Maintenance project for IFF International Flavors; Fragrances at Haverhill in 2012. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
