Client: Frutarom
Site: Hartlepool, UK
Application: Flavour & fragrances manufacturer; Odour scrubber system, operates; at 30,000 m3/hr; Acid scrubber removes NH3 at 99%
Equipment: PVC/GRP packed tower scrubbers, and stack, New ductwork connections to, existing system, PP recirculation liquor pumps, Chemical dosing, 30,000 m3/hr fan and Control panel
Year delivered: 2027
ERG delivered the Packed Tower Scrubber- Frutarom project for Frutarom at Hartlepool, UK in 2027. The case study identifies the application as Flavour & fragrances manufacturer; Odour scrubber system, operates; at 30,000 m3/hr; Acid scrubber removes NH3 at 99%. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
