DSSTW-WABAG

Client: WABAG

Application: Treatment of H,S; OCU-1 capacity 47,500m’ /hr; OCU-2 capacity 40,200m° /hr; OCU-3 capacity 182,000m® /hr

ERG delivered the DSSTW-WABAG project for WABAG. The case study identifies the application as Treatment of H,S; OCU-1 capacity 47,500m’ /hr; OCU-2 capacity 40,200m° /hr; OCU-3 capacity 182,000m® /hr. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.