Client: Al Hijaz for; Dubai Municipality
Site: Dubai South Residential; Pumping Station
Application: Odour Control Plant; 26,000m3/hr, 120ppm H2S ave
Equipment: Bio-trickling filter with synthetic, media, Carbon filter with water, regenerable media, Fans, Local ductwork, Instrumentation and Control panel
Year delivered: 2018
ERG delivered the DUBAI – South project for Al Hijaz for; Dubai Municipality at Dubai South Residential; Pumping Station in 2018. The case study identifies the application as Odour Control Plant; 26,000m3/hr, 120ppm H2S ave. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
