DWOPR-SUEZ

Site: SUEZ, Marubeni

Application: New odour control units as replacement; to the existing; OCU-1is 2 stages. Bio trickling filters; followed by caustic and bleach scrubber

Year delivered: 2022

ERG delivered the DWOPR-SUEZ project at SUEZ, Marubeni in 2022. The case study identifies the application as New odour control units as replacement; to the existing; OCU-1is 2 stages. Bio trickling filters; followed by caustic and bleach scrubber. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.

The available case sheet records a tailored equipment package. The scope was developed around the specific process and site requirements identified by the client. Where ductwork, fans, pumps, controls or instrumentation are named, they are part of the documented supply rather than assumptions about the wider plant.

Case Studies

Industrial gas cleaning/Thermal systems

System Maintenance

Odour control

Plastic-GRP Fabrication