KPIZ

Client: Metito for ADSSC

Site: KPIZ (Khalifa Port Industrial Zone), Abu Dhabi

Application: Odour Control Plant; 35,000m?*/hr, 50ppm; ammonia, 500ppm H2S max

Equipment: 2-stage chemical scrubber: acid dosed for, ammonia and caustic dosed for H2S, treatment, Chemical storage and dosing, Fans, Carbon filters, Local ductwork and Instrumentation

Year delivered: 2013

ERG delivered the KPIZ project for Metito for ADSSC at KPIZ (Khalifa Port Industrial Zone), Abu Dhabi in 2013. The case study identifies the application as Odour Control Plant; 35,000m?*/hr, 50ppm; ammonia, 500ppm H2S max. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.

Case Studies

Industrial gas cleaning/Thermal systems

System Maintenance

Odour control

Plastic-GRP Fabrication