Client: CPL
Site: Immingham
Application: Syngas treatment and integrated; energy recovery for UK’s largest; AD digestate gasification pilot; plant
Equipment: CS Direct Fired Thermal Oxidiser, ceramic fibre lining, CS Cyclone for dust removal, CS Mixing air mixing bustle, SS Fan and ductwork and SS Stack, 15m, double-skin
Year delivered: 2024
ERG delivered the Thermal Oxidiser – CPL project for CPL at Immingham in 2024. The case study identifies the application as Syngas treatment and integrated; energy recovery for UK’s largest; AD digestate gasification pilot; plant. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.