Lumenisity

Client: Lumenisity

Site: Southampton, UK

Application: Design, supply, installation &; commissioning of fume extract and; treatment system; Industrial laser manufacturer- acidic gas

Gas flowrate: 6,000m*/hr; Equipment scope:; V-tex® scrubber treating highly; contaminated air

Year delivered: 2022

ERG delivered the Lumenisity project for Lumenisity at Southampton, UK in 2022. The case study identifies the application as Design, supply, installation &; commissioning of fume extract and; treatment system; Industrial laser manufacturer- acidic gas. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.