Crossness-aer

Site: Crossness STW

Application: Principal contractor for the refurbishment; of two OCUs, installed and supplied:; Refurbished bioscrubber irrigation; Disposal of spent biofilter media, plenum

Year delivered: 2022

ERG delivered the Crossness-aer project at Crossness STW in 2022. The case study identifies the application as Principal contractor for the refurbishment; of two OCUs, installed and supplied:; Refurbished bioscrubber irrigation; Disposal of spent biofilter media, plenum. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.

Case Studies

  • All
  • Case Studies
  • Other Industries
  • Renewable Energy and Syngas
  • Tech Sector Manufacturing
  • Wastewater

Industrial gas cleaning/Thermal systems

System Maintenance

Odour control

Plastic-GRP Fabrication