Site: East Hyde
Application: Odour Control Plant for upgraded sludge; tanks and imported sludge screens
Equipment: Bio-trickling filter with stairway access, Carbon filters, Fans, Ductwork system and stack, Instrumentation and MCC/Control panel and kiosk
Year delivered: 2019
ERG delivered the East Hyde project at East Hyde in 2019. The case study identifies the application as Odour Control Plant for upgraded sludge; tanks and imported sludge screens. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
The equipment scope centred on Bio-trickling filter with stairway access, Carbon filters, Fans, Ductwork system and stack, Instrumentation and MCC/Control panel and kiosk. These listed items show how the primary treatment technology was combined with the supporting mechanical, electrical and gas-handling components needed for an integrated installation. Where ductwork, fans, pumps, controls or instrumentation are named, they are part of the documented supply rather than assumptions about the wider plant.
