Client: Southern Water, Broomfield; Bank STW, Dover
Application: Refurbishment of failing; scrubber system; Scope:; Principal Designer and
Equipment: Two parallel scrubbers treating, 76,500m3/hr air, New scrubber vessels with, associated recirc pumps and, pipework, Ductwork modifications and Reuse of serviceable assets
ERG delivered the Southern Water, Broomfield – Chemical Scrubbers project for Southern Water, Broomfield; Bank STW, Dover. The case study identifies the application as Refurbishment of failing; scrubber system; Scope:; Principal Designer and. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.