Odour Control Plant Upgrade at Eastney, Portsmouth – Chemical Scrubbers and Underground Ductwork

Project Overview

ERG Air Pollution Control delivered an odour control plant upgrade for Southern Water at Eastney, Portsmouth, in 2016.

The project involved upgrading an existing odour control installation within a live underground wastewater facility, incorporating replacement ductwork, modifications to existing equipment, a new chemical scrubber and associated chemical storage and dosing systems.

Working as a specialist contractor to CDM principal contractor requirements, ERG undertook design studies and project supply activities to support the refurbishment of the existing air treatment infrastructure.

The project also included upgraded fans and a discharge stack, providing an integrated approach to improving the site’s odour extraction and treatment arrangements.

The Eastney installation demonstrates ERG’s capability to undertake complex odour control refurbishment projects in operational wastewater environments where access, existing infrastructure and continuity of site operations must be considered.

The Challenge – Upgrading Odour Control in a Live Underground Facility

Wastewater treatment and conveyance infrastructure can generate odorous air requiring controlled extraction and treatment.

Underground wastewater facilities present particular engineering challenges because equipment and ductwork may be located in confined or difficult-to-access areas, with limited space for installation and maintenance.

At Eastney, Southern Water required an upgrade to its existing odour control plant.

The original project documentation identifies the work as taking place within live underground works, making integration with the existing installation a central consideration.

The project required replacement of ductwork in the underground inlet works, modification of an existing scrubber and installation of additional chemical treatment equipment.

Undertaking this type of refurbishment requires careful consideration of the existing plant arrangement, access routes, equipment interfaces and construction activities.

The original case study does not specify the design air flow, contaminant concentrations or required outlet odour performance.

ERG’s Solution – Chemical Scrubber Upgrade and New Treatment Equipment

ERG’s scope included modification of the existing chemical scrubber and the supply and installation of a new chemical scrubber.

Chemical scrubbers are widely used in wastewater odour control applications to treat suitable gaseous contaminants through contact with a circulating treatment liquid.

Depending on the contaminants present, chemical treatment can involve absorption and reactions with selected scrubbing reagents.

Hydrogen sulphide and other odorous compounds can be associated with wastewater infrastructure, although the original Eastney project sheet does not identify the specific contaminants targeted.

The combination of modifications to existing equipment and installation of a new scrubber demonstrates an approach to upgrading an established odour control system rather than replacing the entire installation.

The original documentation does not specify the scrubber construction materials, chemical reagents, treatment stages or removal efficiencies.

Replacement Underground Ductwork

A significant element of the project involved replacing ductwork within the underground inlet works.

Ductwork forms an essential part of an odour control system, collecting contaminated air from designated extraction points and conveying it to the treatment equipment.

In underground wastewater facilities, ductwork design must account for the physical constraints of the existing structures, available installation routes and connection points.

The Eastney project photographs show extensive ductwork within the underground works and external connections between buildings and treatment equipment.

These images illustrate the practical engineering requirements associated with integrating new air extraction infrastructure into an existing operational facility.

Chemical Storage, Dosing and Supporting Equipment

ERG’s equipment scope included chemical storage and dosing systems to support the new chemical scrubber.

Chemical dosing equipment provides a controlled means of introducing treatment reagents into a wet scrubbing process.

The appropriate chemical selection and dosing requirements depend on the contaminants being treated and the operating conditions of the scrubber.

The Eastney project also included upgraded fans and a discharge stack.

Fans provide the airflow required to convey extracted air through the ductwork and treatment equipment, while the stack provides a defined discharge point for treated air.

Together, these components formed part of the wider odour control plant upgrade.

Working Within an Operational Wastewater Facility

The project required work within live underground wastewater infrastructure.

Refurbishment projects of this nature differ from new-build installations because new equipment must be integrated with existing structures and operating plant.

ERG’s documented scope included design studies and project supply activities, together with equipment modification and installation.

The original case study also identifies CDM principal contractor arrangements, reflecting the construction management requirements associated with the project.

The photographs show substantial treatment vessels, access platforms, ductwork and associated mechanical equipment within the existing facility.

The installation demonstrates ERG’s experience in delivering engineered odour control upgrades within established wastewater infrastructure.

Project Specifications

ParameterProject detail
ClientSouthern Water
SiteEastney, Portsmouth, UK
IndustryWastewater infrastructure
ApplicationExisting odour control plant upgrade
Project environmentLive underground works
Existing equipmentModification of existing scrubber
New equipmentChemical scrubber
DuctworkReplacement within underground inlet works
Chemical systemsStorage and dosing
VentilationUpgraded fans
DischargeUpgraded stack
Project activitiesDesign studies and project supply
Construction arrangementsCDM principal contractor
Year delivered2016

Refurbishment and Upgrading of Wastewater Odour Control Systems

Existing wastewater odour control installations may require upgrading as equipment ages, operating requirements change or improvements are needed to maintain effective air extraction and treatment.

Refurbishment can involve replacing individual components, modifying treatment equipment or introducing additional treatment stages.

Chemical scrubber upgrades may also require associated changes to ductwork, fans, chemical dosing and discharge arrangements.

The Eastney project provides an example of an integrated refurbishment involving several elements of an established odour control system.

It also illustrates the importance of considering the wider extraction and ventilation arrangement rather than treating the scrubber as an isolated component.

ERG’s Experience in Odour Control Plant Upgrades

ERG Air Pollution Control designs, supplies and installs odour control systems for wastewater treatment facilities and industrial applications.

Its capabilities include chemical scrubbing, biological odour control, activated carbon filtration and the refurbishment of existing air treatment equipment.

The Southern Water Eastney project demonstrates ERG’s ability to deliver upgrades incorporating new chemical scrubbing equipment, modifications to existing plant, replacement ductwork and supporting ventilation systems.

Delivered in 2016, the installation provides a reference for odour control refurbishment within a live underground wastewater facility.

For further information about wastewater odour control upgrades, chemical scrubbers, ductwork replacement or refurbishment of existing air treatment systems, contact ERG Air Pollution Control.

Case Studies

  • All
  • Case Studies
  • Other Industries
  • Renewable Energy and Syngas
  • Tech Sector Manufacturing
  • Wastewater

Industrial gas cleaning/Thermal systems

System Maintenance

Odour control

Plastic-GRP Fabrication