Client: BPE for Aptuit
Site: Abingdon, UK
Application: Process reactor vent scrubber; system for pharmaceutical; manufacture; 99.6% removal of NH
Gas flowrate: 70m® /hr; Equipment scope:; Replacement for previous,; end-of-service-life equipment
Year delivered: 2021
ERG delivered the Aptuit project for BPE for Aptuit at Abingdon, UK in 2021. The case study identifies the application as Process reactor vent scrubber; system for pharmaceutical; manufacture; 99.6% removal of NH. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
