Client: Alcoa
Site: Birmingham
Equipment: V-Tex scrubber and and plume suppression
Gas flowrate: 14,400m3/hr
Year delivered: 2010
ERG delivered the Alcoa project for Alcoa at Birmingham in 2010. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
