Altek

Site: Bahrain 

Application: Aluminium recycling plant; Aluminium salt dryer and reactor; off-gas abatement; 99% removal of dust

Gas flowrate: 38,000m3/hr; Equipment scope:; Design, supply, delivery of; Main plant: high energy. variable

Year delivered: 2020

ERG delivered the Altek project at Bahrain in 2020. The case study identifies the application as Aluminium recycling plant; Aluminium salt dryer and reactor; off-gas abatement; 99% removal of dust. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.

Case Studies

Industrial gas cleaning/Thermal systems

System Maintenance

Odour control

Plastic-GRP Fabrication