Client: PWE-GEC JV for Ashghal
Site: Doha South Terminal; Pumping Station, Qatar
Application: Odour Control; Plant: 120,000m3/hr,; 335ppm H2S max, >99.98%; efficiency
Equipment: 8-off Bio-trickling filters in parallel, 4.0m dia, GRP, with liquor, recirculation pumps and nutrient, addition, 3-off Fans (2x duty & 1x standby), 3168S, with acoustic enclosure, 4-off Carbon filters, GRP, Ductwork, dampers & stack, GRP, Access & support steelwork, Instrumentation & live outlet odour and monitoring
ERG delivered the Doha South TPS project for PWE-GEC JV for Ashghal at Doha South Terminal; Pumping Station, Qatar. The case study identifies the application as Odour Control; Plant: 120,000m3/hr,; 335ppm H2S max, >99.98%; efficiency. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.