Client: Southern Water
Site: Ashford, UK
Application: Upgrade to existing OCU,; ductwork connections to new; covers fitted and glassed on site; Design, supply, install and
Equipment: PVC/GRP Bio-trickling filter, with, access platform, PVC/GRP Carbon filter, Duty/standby 155 m3/h PP fans, MCC/control panel in close-fit and kiosk
Year delivered: 2022
ERG delivered the Southern Water – Ashford – Bio trickling / Carbon Filter project for Southern Water at Ashford, UK in 2022. The case study identifies the application as Upgrade to existing OCU,; ductwork connections to new; covers fitted and glassed on site; Design, supply, install and. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
