Client: CPL
Site: Grimsby
Application: Carbon Reactivation Plant; Thermal oxidiser off-gas; treatment
Equipment: High temperature quench, Venturi and droplet separator, Multistage tray tower and Packed tower scrubber
Year delivered: 2018
ERG delivered the Quench / Venturi – CPL project for CPL at Grimsby in 2018. The case study identifies the application as Carbon Reactivation Plant; Thermal oxidiser off-gas; treatment. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.