Site: Eastney, Portsmouth
Application: Existing odour control plant upgrade- design; study, project supply in live underground; works, CDM principal contractor
Equipment: Ductwork replacement in underground, inlet works, Modification of existing scrubber, Supply and install new chemical scrubber, and chemical storage/dosing and Upgraded fans and stack
Year delivered: 2016
ERG delivered the Southern Water – Eastney, Portsmouth – Chemical Scrubber / Ductwork / Tank project at Eastney, Portsmouth in 2016. The case study identifies the application as Existing odour control plant upgrade- design; study, project supply in live underground; works, CDM principal contractor. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.