SAFC Hitech

Client: SAFC Hitech

Site: South Korea

Equipment: 2 off 3 stage V-tex scrubbers

Gas flowrate: 15,000m3/hr

Year delivered: 2010

ERG delivered the SAFC Hitech project for SAFC Hitech at South Korea in 2010. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.

Case Studies

Industrial gas cleaning/Thermal systems

System Maintenance

Odour control

Plastic-GRP Fabrication