Client: Fluor for Halliburton
Site: Jubail, KSA
Application: Design, supply, delivery and; commissioning of a multi-; stage scrubber package for; vents from ethylene oxide
Equipment: Quench (Hastelloy), Packed tower scrubber and, sump tank (ECTFE/GRP), Skid-mounted pipework &, valves (PTFE/PFA lined), pump, ECTFE lined) and heat, exchanger (titanium), Instrumentation wired to LJBs, Lead/lag carbon filters (GRP), Fan (epoxy CS), 30m stack (epoxy CS) and Access structures
Year delivered: 2020; PROJECT; DETAILS; Trial assembly of quench and wet
ERG delivered the Halliburton project for Fluor for Halliburton at Jubail, KSA in 2020; PROJECT; DETAILS; Trial assembly of quench and wet. The case study identifies the application as Design, supply, delivery and; commissioning of a multi-; stage scrubber package for; vents from ethylene oxide. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.