Client: Otto Simon for Tata Steel
Site: Port Talbot
Application: Steel pickling strip line- HCl fume scrubber
Equipment: Packed tower scrubber, Pumps and pipework, Fans, Ductwork and road crossing and 48m high discharge stack in lattice frame
Year delivered: 2016
ERG delivered the Tata Steel Port Talbot project for Otto Simon for Tata Steel at Port Talbot in 2016. The case study identifies the application as Steel pickling strip line- HCl fume scrubber. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.