Pilot Plant

Application: Two stage packed tower; system and carbon filter; Soluble acid gas and/or; ammonia removal, VOC

Equipment: Two PP/GRP packed towers, with sump low level switches, PP 16m3/hr recirculation, pump with magflow, transmitter, PP 4m3/hr recirculation pump, PP ID fan 1,000 m3/hr, 316SS Heat exchanger, Galvanised CS gas heater, uPVC/GRP Carbon filter, PROJECT and DETAILS

ERG delivered the Pilot Plant project. The case study identifies the application as Two stage packed tower; system and carbon filter; Soluble acid gas and/or; ammonia removal, VOC. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.