Client: Eight20 for Thames Water
Site: Crossness STW, London
Application: Syngas scrubber package tt; remove acid gases (H,!; HCN) from syngas (H,, CH,; CO) containing VOCs, tars
Equipment: Derakane 470 V-tex*, scrubber with PVDF/PTFE, internals (BS EN 13121), ECTFE lined pump, PVDF, pipework and valves, Heat exchanger, Effluent reaction tank, Chemical storage & dosin, Control panel & kiosk and Year installed: 2019
ERG delivered the Crossness AER project for Eight20 for Thames Water at Crossness STW, London. The case study identifies the application as Syngas scrubber package tt; remove acid gases (H,!; HCN) from syngas (H,, CH,; CO) containing VOCs, tars. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
