Client: Doosan Babcock
Site: Carbon Capture & Storage; plant at Ferrybridge Power; Station
Equipment: Two stage tray scrubber, Direct contact cooler, Liquor storage tanks and e Control instrumentation
Gas flowrate: 22,000ms/hr
Year delivered: 2011
ERG delivered the Tray Scrubber – Doosan Babcock project for Doosan Babcock at Carbon Capture & Storage; plant at Ferrybridge Power; Station in 2011. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
