Client: Confidential Battery; Technology Manufacturer

Site: Europe

Application: Ammonia removal from; combined process vent from; battery manufacture process; 99.9% removal of ammonia

Gas flowrate: 21,000 Nm3/hr; Equipment scope:; Derakane GRP quench, packed; tower (generally to BS EN

Year delivered: 2022; PROJECT; DETAILS; Trial assembly of the

ERG delivered the Ammonia Scrubbing Project project for Confidential Battery; Technology Manufacturer at Europe in 2022; PROJECT; DETAILS; Trial assembly of the. The case study identifies the application as Ammonia removal from; combined process vent from; battery manufacture process; 99.9% removal of ammonia. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.