GSK Montrose

Client: GSK

Site: Montrose, Scotland

Application: Process scrubber treating; bromination area process; vents – batch scrubbing; Up to 1,300m3/hr gas flow

Equipment: ECTFE lined GRP scrubber, and sump, BS EN 13121 and, PED:SEP, ETFE lined magdrive pumps, PFA lined pipework & valves, 316 SS fan, Instrumentation and LJBs for, site connection to DCS, Skid mounted with integral, access and ATEX: EX II 2G IIB T4

Year delivered: 2023; PROJECT; DETAILS; Skid assembly and

ERG delivered the GSK Montrose project for GSK at Montrose, Scotland in 2023; PROJECT; DETAILS; Skid assembly and. The case study identifies the application as Process scrubber treating; bromination area process; vents – batch scrubbing; Up to 1,300m3/hr gas flow. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.

Case Studies

Industrial gas cleaning/Thermal systems

System Maintenance

Odour control

Plastic-GRP Fabrication