Client: Biffa Waste
End user: Warnham
Application: Municipal Waste Recycling; Centre and Anaerobic; Digestion Site – Odour; Control Package Upgrade
Equipment: High flowrate annular carbon filter, Fan, Steam reheat, Ductwork modification, Access structure and Stack modification
Year delivered: 2015
ERG delivered the Biffa Waste – Warnham – Carbon Filter project for Biffa Waste, with Warnham named as the end user in 2015. The case study identifies the application as Municipal Waste Recycling; Centre and Anaerobic; Digestion Site – Odour; Control Package Upgrade. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
