Application: Kibble manufacture- part 1 refurbishment; and upgrade of odour control system
Equipment: 2-stage scrubbing, Fan & ductwork system, Demister and reheater, Carbon filter, MCC/Control panel, crubber-upper section rotated to, uctwork to the heater and carbon, 2d back to the original stack, Scope, Design, supply, install and commission, new OCU equipment and Refurb of existing 1990s
Year delivered: 2020; Demister and steam-fed; 5 duct heater to condition the|; oy air for carbon treatment
ERG delivered the Nestle Purina project in 2020; Demister and steam-fed; 5 duct heater to condition the|; oy air for carbon treatment. The case study identifies the application as Kibble manufacture- part 1 refurbishment; and upgrade of odour control system. The project formed part of ERG’s work in engineered air-pollution control and process-gas treatment, with the supplied package tailored to the operating context recorded on the original case sheet.
